Providence, on the record
Liam Freaney · reporting built on the public record

Compared

Three of the bills Providence pays, set against other places: the sewer-overflow tunnels, the dams upstream, and the line against the sea.

Sewer overflow programs

Each system below is building tunnels or green infrastructure to stop sewage overflowing into rivers in storms, and each is paying for it through customers’ bills.

SystemProgram costPer householdTypical yearly billHelp for low-income households
Narragansett Bay Commission (Providence area)~$1.72 billion12~$22,400 per residential account3$638, sewer only (2026)4None
New York City DEP~$14.9 billion5~$4,5006~$1,224, water and sewer (FY2026 proposed)7$159 credit for 96,500 households; $250 per unit in 65,000 apartments7
Philadelphia Waterat least $4.5 billion8~$6,6009~$1,132, water, sewer and stormwater (from Sept 2026)10Tiered Assistance Program caps the bill at a share of income11
DC Water~$2.7–3.0 billion12~$9,20013$1,766 (FY2026)14CAP tiers discount water and sewer and cut the impervious-area charge 50–75%14

Per household is our arithmetic: program cost over households (Census, 2020–24). For the Bay Commission it is over 76,460 residential accounts, which undercounts renter households in multifamily buildings. The Bay Commission’s bill is sewer only; the others include water.

Dams

High-hazard dams are those whose failure would likely kill people downstream.

Rhode IslandConnecticutMassachusettsNew York
High-hazard dams with an emergency action plan1552%93%99%99%
High-hazard dams with a last-inspection date on file157 of 95273 of 282339 of 342450 of 451
State repair money for dam ownersNone dedicated; $4.4M in the 2018 bond, for state-owned dams only1617Bond money for state-owned dams18Nearly $146M in grants and loans since 2013; loans open to private owners1920—
FEMA high-hazard dam rehabilitation grant, Fall 202421Not listed$3.04M$6.98M—

National Inventory of Dams figures are what each state has filed; Rhode Island’s federal record is partly out of date, and the state’s own 2024 report counts 87 of 173 required emergency plans approved. FEMA lists only allocations to states that applied.

When a dam fails: Michigan, 2020

After the Edenville and Sanford dams failed in May 2020, restoring the four lakes was put at $398.9 million. After state and other offsets, $217.7 million is being assessed on property owners around the lakes2223. Downstream residents’ suit against the state was dismissed on April 23, 2026; the court found the private owners, not the state, controlled the dam24.

The line against the sea: three coasts

Providence sits behind a federal surge barrier. Miami Beach built pumps and raised its roads. The Outer Banks buys sand and bridges over the inlets. Three ways a coast gets paid for, set side by side.

Fox Point, ProvidenceMiami BeachThe Outer Banks (Dare County, N.C.)
The defenseA surge barrier across the Providence River with five pumps (7,000 cubic feet a second), built 1960–66; river gates and street and sewer gates2526Pump stations (48 built, 83 planned), raised roads, seawalls and one-way valves, since 201427Sand: about $306 million placed on town beaches 2011–2026; NC 12 kept open; two bridges over the inlets282930
Who built itThe Army Corps, 70 percent federal, 30 percent non-federal25The city, from its own capital program27The towns and the county (sand); NCDOT (the road and bridges). The Corps’ 2001 project was never built28
Who runs itThe Corps since February 2010: the barrier, river gates and pumps. The city: its street and sewer gates31The city27The towns and county contract the dredges; NCDOT the road28
Capital cost$16 million in 196625, about $160 million in today’s dollars [MODEL]$103 million of stormwater projects completed since 2011 (the city’s figure); $3.7–4.74 billion to finish the 2024 master plan27Sand about $306 million (2011–26; the 2026 round not final); bridges about $407 million; the Pea Island corridor more than $72 million since 201028293032
Yearly costCorps operation and maintenance, FY2026: $6,348,000 ($3,808,800 to the project, $2,539,200 to the district)33. The city’s own line for its gates isn’t publishedA stormwater fee of $30.14 a month per 791 square feet of roof and pavement (FY2023), about $362 a year; $241.1 million of stormwater bonds outstanding (Sept. 2023)3435Two of the county’s six occupancy-tax points, $16.3 million in FY2024, to the Beach Nourishment Fund; FEMA reimbursement after storms36
Who paysCongress, through the Corps; the city for its gates. The households behind the barrier pay nothing directEvery property, in proportion to its impervious area, citywide; passed through to rentersVisitors (the occupancy tax); owners through service districts and property tax, about half of each project; FEMA after each storm; NCDOT for the road
Protected households1,782 occupied households inside the line; 18,582 jobs; $2.81 billion of assessed value, more than half of it exempt3741,600 households3816,836 households; 36,495 housing units, most of them second homes and rentals39
Per protected household [MODEL]Capital about $90,000 (the local 30 percent share about $27,000); yearly $3,560, or $2,140 for the project alone; per job, $340Capital $2,500 (the city’s $103 million) to $89,000–114,000 (the master plan); yearly, the fee on the property’s roof and pavementSand $18,000 per household, $8,400 per housing unit; bridges $24,000 and $11,000; yearly $968 per household from visitors
Outside the line75 coastal-zone parcels on 301 acres of lower ground, the Fields Point treatment plant among them. 589 flood policies citywide; behind the barrier, 329 in zone X at a median $4,120, one on a primary residence37The mainland waits on the Corps’ Back Bay plan: walls dropped, $2.66 billion of house-lifting and floodproofing, authorized in December 2024, unfunded40. Flood premiums run eightfold from inland Hialeah ($357–402) to the beach ($2,480–3,080)41Rodanthe and north Buxton, between sand cycles: 32 houses have fallen into the sea since 2020, 20 of them since September 202542. The county now buys one at a time ($250,000)43. Flood premiums there run $493–669 against $11,513 of claims paid per policy41

Per household is our arithmetic, and the denominator is a choice. Providence: occupied households in the 2020 Census blocks inside the barrier’s levee-credited area, from Inside the Line; the barrier protects more jobs and tax base than homes. Miami Beach: households, 2020–24. Dare County: households and housing units; the sand protects the units, 54 percent of which are nobody’s household. The 1966 cost is scaled to today by the consumer price index, about tenfold. Press figures of $400–600 million for Miami Beach’s program are not reconciled with the city’s $103 million and are left out.

An island buys cash, not protection. Jamaica’s parametric insurance and catastrophe bond paid about $242 million within weeks of Hurricane Melissa (2025)4445, against damage the World Bank and IDB put at $8.8 billion46: about three cents on the dollar. Puerto Rico after Maria was obligated $35.6 billion in FEMA public assistance, about $22,700 per housing unit [MODEL]47; its power authority had spent $2.7 billion of $11.1 billion by December 202548.

Up the coast

The same question, from Maine to Georgia: what holds the water back, who pays for it, and who is left outside the line.

PlaceThe defenseCostWho paysPer unit [MODEL]Outside the line
Portland, MaineNone built. Repair money after the record tide of Jan. 13, 2024A $60 million state package: $21.2 million to 68 working waterfronts49, $25.2 million to 39 towns, Portland $3.6 million50; FEMA public assistance $51.0 million statewide51Maine's General Fund; FEMA for public worksFour Portland wharf owners got $6.7 million, about $1.7 million each52Private wharves FEMA can't reach
Hampton, N.H.Town seawalls and drainage; state seawalls on Route 1ARoute 1A: $20.3 million federal53; Hampton: $2.7 million seawall, $4.1 million drainage54The town; the federal highway program. FEMA public assistance to Hampton $380,56555—Homeowners: the state requested no FEMA household aid56; 6 of about 40 eligible homes applied to be raised54
New York HarborHarbor barriers studied and parked; the East Side wall in Manhattan; dunes in the Rockaways; buyouts on Staten IslandHarbor plan $52.6 billion, parked57; East Side $1.45 billion58; Rockaways $961.8 million59; Staten Island buyouts about $200–230 million60The East Side: the city about 77 percent, HUD $338 million61; the Rockaways' first build, federal59East Side about $13,200 per resident protected (110,000); Staten Island about $370,000–460,000 per home bought (500–540)Staten Island blocks that asked into the buyouts were refused in 201462
The Jersey ShoreCorps beach fill and dunes; voluntary buyouts inland (Blue Acres)Long Beach Island $128 million, federal63; Blue Acres more than $234 million paid for more than 1,200 homes64Nourishment: 65 percent federal, 26.25 state, 8.75 the town; the state's share from the realty transfer fee65About $1,909 per foot of beach (Long Beach Island); about $195,000 per property boughtNo buyouts on the oceanfront: no willing sellers66. The Wildwoods project ended in Nov. 2025 after two towns withdrew67
Annapolis and BaltimoreAnnapolis: a barrier and pump station at City Dock. Baltimore: a stormwater feeCity Dock about $90 million68, at least $47.8 million federal69; Baltimore fee revenue $55.73 million (FY2024)70Annapolis: federal grants, and a garage handed to a private operator for $25 million up front71. Baltimore: by impervious area; worship and school buildings $12 per unit72Baltimore about $254 a year per paying property (219,335)70City Dock businesses carried the flood and construction losses68
Norfolk, Va.About eight miles of downtown floodwall, a surge barrier, pump stations$6.134 billion, up from $1.4 billion; done 20377365 percent federal; the city more than $2 billion73; the state about $86.5 million so far74—Five Southside neighborhoods get no wall; their elevation program is paused75
Charleston, S.C.A peninsula wall, redesigned as a 10-foot raised BatteryAbout $1.3 billion (the city's figure)76; $1.132 billion in the 2022 Chief's Report7765 percent federal; the city about $455 million, $225 million of it on the November 2026 county sales-tax ballot78; upkeep, about $3 million a year, all the city's77About $38,000 per peninsula resident (about 34,000)79About 100 houses in Rosemont and Bridgeview Village, offered raising or floodproofing instead80; three-quarters of the city lives off the peninsula79
Tybee Island, Ga.Corps beach fill since about 1974, every seven to ten years2026 round $20 million: $12 million federal, $8 million local and state81About 60 percent federal, 40 the city, county and state82; the city's share from a room-tax reserve83—Cut from the Corps' 2026 work plan in April84, restored in September81

Per unit is our arithmetic, and the unit changes by row because the records count different things: residents protected (Manhattan’s East Side; Charleston’s peninsula, about a quarter of the city’s 136,000 people), homes bought (Staten Island, New Jersey), feet of beach, properties billed. A dash means no count is in hand yet. The 1960s barriers at New Bedford and Stamford stay off this page with Providence’s own barrier row.

Sources

  1. NBC, evaluating the CSO program (2024)
  2. NBC, CSO abatement history and future (2024)
  3. NBC annual financial report FY2017 (residential accounts)
  4. PUC Docket 25-32-WW compliance filing (2026 rates)
  5. NYC DEP, Flushing Bay LTCP meeting, Dec 2025
  6. Census QuickFacts, New York City households
  7. NYC DEP, FY2026 proposed rate
  8. Circle of Blue (2024), Green City, Clean Waters cost
  9. Census QuickFacts, Philadelphia households
  10. Philadelphia Rate Board, July 23 2025
  11. Philadelphia TAP 2025 annual report
  12. ASCE (2023), DC Water final CSO tunnel
  13. Census QuickFacts, DC households
  14. DC Water 2026 ratepayer town halls
  15. USACE National Inventory of Dams, national export (pulled 2026)
  16. 2018 Green Economy bond, Article 5
  17. ecoRI on RI dam funding
  18. CT Public, Jan 2 2024, state-owned dam repairs
  19. Mass. Dam and Seawall program awards, Sept 2025
  20. 301 CMR 15.04 (who may get grants and loans)
  21. FEMA High Hazard Potential Dams grant allocations
  22. Four Lakes Task Force, total capital amount to be assessed
  23. Michigan Public, May 19 2025
  24. Michigan AG, Apr 23 2026, Court of Claims dismissal
  25. US Army Corps of Engineers, Coastal Engineering Research Center, Bulletin FY1967-69 (Fox Point: $16 million, 30 percent non-federal; five pumps, 7,000 cfs; completed 1966)
  26. US Army Corps of Engineers, New England District: Fox Point Hurricane Barrier
  27. City of Miami Beach, Stormwater Master Plan presentation to the Commission, Mar. 13, 2024 ($103 million completed since 2011; $3.7-4.74 billion to finish)
  28. Dare County, beach nourishment completed projects
  29. Outer Banks Voice, Feb. 4, 2026: Nags Head's $36.4 million 2026 nourishment contract
  30. NCDOT, Jul. 28, 2022: Rodanthe bridge opens ($155 million)
  31. Sen. Reed, Feb. 19, 2010: transfer of the Fox Point Hurricane Barrier to the Corps (280 acres; up to $500,000 a year saved by the city)
  32. Island Free Press: NC 12 closures on Pea Island (more than $72 million since 2010)
  33. US Army Corps of Engineers, Civil Works FY2026 Work Plan, Operation and Maintenance (Fox Point: $6,348,000)
  34. City of Miami Beach, continuing disclosures FY2023 (stormwater rate per ERU; stormwater bonds outstanding)
  35. City of Miami Beach, stormwater utility fee calculation worksheet (one ERU = 791 sq ft of impervious surface)
  36. Dare County, occupancy tax distributions (Beach Nourishment Fund)
  37. Inside the Line: who and what is inside the barrier (2020 Census blocks, 2025 tax roll), flood insurance by block group
  38. Census QuickFacts, Miami Beach city, Fla. (households 2020-24)
  39. Census QuickFacts, Dare County, N.C. (households 2020-24; housing units 2025)
  40. US Army Corps of Engineers, Miami-Dade Back Bay Chief's Report, Aug. 26, 2024 ($2.66 billion, nonstructural)
  41. FEMA OpenFEMA, NFIP policies (in force June 30, 2025) and claims, Miami-Dade and Dare
  42. National Park Service, Cape Hatteras: threatened oceanfront structures (32 collapses since 2020)
  43. Island Free Press, May 2026: Dare County buys and demolishes a Buxton house ($250,000)
  44. CCRIF, system summary, July 2026 ($483.1 million paid since 2007)
  45. World Bank, Nov. 7, 2025: Hurricane Melissa triggers a 100 percent payout of Jamaica's $150 million catastrophe bond
  46. World Bank and IDB, Nov. 19, 2025: Hurricane Melissa damage to Jamaica, an all-time high
  47. FEMA OpenFEMA, Public Assistance funded projects (Puerto Rico, Maria: $35.6 billion federal obligated)
  48. GAO-26-107772, Dec. 2025: PREPA, $11.1 billion obligated, $2.7 billion disbursed
  49. Gov. Mills, Jul. 22, 2024: $21.2 million in resilience grants to 68 working waterfronts
  50. Maine Infrastructure Adaptation Fund awards, Aug. 9, 2024
  51. FEMA OpenFEMA, Public Assistance funded projects, DR-4764-ME
  52. Maine, working waterfront resilience grants, July 2024 (award list)
  53. Sens. Shaheen and Hassan, Rep. Pappas: $20.3 million for Route 1A, North Hampton and Rye
  54. Town of Hampton memo, Nov. 19, 2024 (via hamptonbeach.org)
  55. FEMA OpenFEMA, Public Assistance funded projects, DR-4771-NH
  56. NH Homeland Security and Emergency Management, DR-4771 summary, Apr. 19, 2024 (no Individual Assistance requested)
  57. ASCE, Nov. 2022: the Corps' $52.6 billion plan for New York–New Jersey harbor barriers
  58. City of New York, East Side Coastal Resiliency: project background
  59. House Transportation and Infrastructure Committee: Rockaway project summary
  60. Lincoln Institute, Staten Island buyouts case study
  61. HUD notice for ESCR ($338 million CDBG-DR)
  62. DNAinfo, Apr. 11, 2014: no more neighborhoods in the Sandy buyout program
  63. Philadelphia Inquirer, Dec. 10, 2014: Long Beach Island replenishment
  64. Inside Climate News, Dec. 25, 2025: New Jersey's Blue Acres buyouts
  65. NJDEP, Shore Protection Program cost shares
  66. WHYY, 2019: Blue Acres' 700th property; no oceanfront sellers
  67. Philadelphia Inquirer, Nov. 7, 2025: the Wildwoods replenishment plan ends
  68. The Banner, Aug. 10, 2026: City Dock flooding and businesses
  69. Rep. Elfreth, Mar. 6, 2026: $35.5 million FEMA for City Dock; $47.8 million federal since 2021
  70. Maryland Department of the Environment, Baltimore City financial assurance report, FY2024
  71. Miles & Stockbridge: the Annapolis Hillman Garage financing
  72. Baltimore City stormwater remediation fee regulations
  73. Virginia Mercury, Mar. 20, 2026: Norfolk floodwall cost balloons to $6 billion
  74. WHRO, Jan. 26, 2026: Norfolk gets another $25 million from the state
  75. WHRO, May 22, 2025: Norfolk floodwall will take more time and money
  76. Post and Courier, Dec. 6, 2025: Battery Extension planning
  77. Corps Chief's Report, Charleston Peninsula, June 10, 2022
  78. Post and Courier, Jun. 27, 2026: the county transportation sales tax on the ballot
  79. Yale Environment 360, May 5, 2020: Fortress Charleston
  80. Coastal Conservation League: the peninsula perimeter project
  81. WTOC, Sept. 16, 2026: $20 million for Tybee Island renourishment
  82. Grist, Oct. 7, 2026: protecting Georgia's most popular beach
  83. City of Tybee Island, approved FY2026 budget
  84. Atlanta Journal-Constitution, Apr. 2026: Tybee loses federal erosion funds